Description:
"Designing ships berth for Laguna Project “Lagouna jetty” in conjunction with the Engineering Company for Marine Affairs “ECMA”. This jetty is a metal structure consisting of piles (hollow pipes filled with regular concrete) and horizontal and vertical coupling to resist lateral loads and main beams
sub-long with total of about 60 linear meters."
Location: Hurghada
Client: Engineering Company for Marine Affairs “ECMA”
Date: 2010
Description:
Designing ships berth for the project Chiranko (Chiranko is part of the project Melia Pharaoh) in conjunction with the Engineering Company for Marine Affairs “ECMA”. This jetty is a metal structure consisting of piles (hollow pipes filled with concrete) and horizontal coupling and anchored to resist lateral loads and beams. The major sub-beams and the total length about 220 meters long.
Location: Hurghada
Client: Engineering Company for Marine Affairs “ECMA”
Date: 2011
Description:
Designed pier belonging to the company GPI in the Gulf Oil -Hurghada - Red Sea Governorate.
Location: Hurghada
Client: GPI company
Date: 2013
Description:
Preparation of the technical report and the full supervision of the restoration and strengthening of the Nile berth of the Sugar Company located in Armant - Luxor.
Location: Armant - Luxor
Client: sugercane company
Date: 2012